The designs also include a large battery at the site, to guarantee excessive power is usually stored for the night, as well as a 220 kV transmission line which will link the job towards the North Star sub-station, near wherever a different one hundred MW solar task can also be https://totalsolar.com.au/terms-and-conditions/